Field safety and projects
Plan the work, review the hazards, and record crew sign-off.
The JHA is written for the job, the crew signs it with their PIN, and the Today board shows which crews signed and which have not. Hazards, meetings, inspections and packets attach to the same project.
Included on every plan, Free included.
- Crew sign-off by PINEach person signs the current revision. A change in the field means signing again.
- A flag for missing JHAsScheduled crews with no JHA on file shows on the Today board.
- One action listCorrective actions, meeting items and hazard follow-ups, each with an owner.
- Packets from the recordsA job packet is built from the crew's certificates on file when you generate it.
01/JHAs
Start from a template. Fit it to this job.
Each step lists its hazards, controls and PPE, with the risk before and after the controls. Add the permits that must be in place first and the emergency plan: first aid lead, nearest medical facility, AED and muster point.
- Templates by trade, kept and reused
- Permit prerequisites with the permit number and a verified check
- A PDF of the signed JHA
02/Sign-off
The crew signs with a PIN. A change means signing again.
Each crew member signs the JHA with their own PIN, and the supervisor signs it too. When the job changes, log what changed: the weather, a scope shift, a new hazard, a stop work or a near miss.
The JHA moves to a new revision, and everyone who signed the old one is asked to sign again.
- Mark a crew member off site, or back on
- Every revision kept in the change log
- The supervisor's signature tracked per revision
03/Today board
Every crew's JHA for the day, project by project.
The Today board groups the day's JHAs by project, each with one sign-off state. Add the work you expect, by trade and day, and the board flags a crew scheduled to work with no JHA filed.
- Expected work set by trade, dates and weekdays
- A daily summary per project, each count linked back to its record
- The summary sent to people on the job who may open it, each seeing their own view
04/Projects
One page per job, with everything tagged to it.
A project is a job with its crew, its required training and its JHAs, hazards, incidents, meetings and packets. Set it up in one save: name, site, dates, supervisor, crew and the training everyone must hold.
Records that came in without a project wait in the Unassigned queue until a person places them.
- See which crew members meet the requirements you have set and what is still missing
- Extra training required of one person on the crew
- A closed job stays readable, with its open actions still listed
05/Actions
Every follow-up has an owner and a date.
Corrective actions, meeting action items and follow-ups raised from a hazard, a concern or a JHA change sit in one list. The owner submits the work with a note, and a file where proof is required. Someone other than the owner accepts it or sends it back.
Owners get a daily digest of what is due, and an urgent assignment gets its own notice.
- Evidence files kept in private storage
- An owner who left is flagged, and the action counts as unowned
- Failed inspection items land in the same list
06/Safety meetings
Meetings on a schedule, signed by the people who were there.
Plan a meeting series and each supervisor gets their own meetings on the calendar. Lock the topic when it must not change; an allowed change needs a reason and is kept in the history.
Attendees sign with their own PIN, and attendance is saved with the meeting record. The record keeps attendance, action items and a PDF you can email.
- A calendar and a My meetings list for each supervisor
- A late meeting stays open and shows as overdue
- Past meetings searchable
07/Inspections
Recurring inspections that come back on time.
Set an inspection or audit with its checklist, the person who does it and a backup. Reminders go out before it is due and escalate when it is late.
A failed item becomes an action with an owner, and the history exports to CSV.
- Photos on checklist items
- A completed inspection is never edited, only given notes
- The assigned person completes it without needing other permissions
Also included
More features
More ways to keep your safety work organized.
-
01
Job packets
A packet PDF for the general contractor with the supervisor's and crew's certificates and your company documents. Regenerate it when records change.
-
02
Hazard observations
Log a hazard on site with its severity, and raise a follow-up action from it.
-
03
Safety concerns
Named, confidential or anonymous. An anonymous concern stores no reporter, and follow-ups are added to a thread.
-
04
Meetings keep their template
A meeting keeps a copy of the template it used, so a later template edit never rewrites it.
-
05
Days with nothing recorded
A day with no records reads as incomplete until a reviewer confirms there was no work.
-
06
Digest by email
The daily action digest carries counts and links only, and goes only to active owners.
Questions
About Field safety and projects
01How does the crew sign a JHA?
02Where do permits go?
03What goes in a job packet?
04Can a safety concern be anonymous?
See field safety and projects with your own crew in it.
Start free, load your people and judge it on your own crew instead of a demo. Every part of the application comes with it.
Try up to 500 profiles for 14 days, then keep five profiles on Free. No card required.